Home > Port
 

Contents

Pre Arrival:  Overview | Location | Charts | Limits   ...
Communications:  Pre-Arrival | VHF
Berthing Ops:  Tugs | Berths
Cargo:  Breakbulk | Bulk | Cruise | Tankers | Cranes   ...
Facilities:  Medical | Water | Fuel | Chandlery | Drydock   ...
Security:  Security | Regs
Local Info:  Weather
Shore:  Airport | Connections
Crew:  Leave
Misc:  Authority | Agent
Report:  Report

Summary

Max. Size:  Breakbulk:  LOA 200 m., draft 6.8 m. Passengers:  LOA 200 m., draft 6.8 m. Bulk:  LOA 200 m., draft 6.8 m. Tankers:  LOA 135 m., draft 6.8 m.
Fuel:  Diesel oil. 72 hours' notice.
Airport:  Abruzzo Int'l, 25 km.
Repairs/Drydocks:  Minor repairs possible.
Medical:  Doctor and hospital available.

ITOTN

OVERVIEW:  Abruzzo regional port, handles steel products, bulk salt, vehicles, petroleum products bulk cement, agribulk, project and breakbulk cargoes.
LOCATION:  On the east coast of Italy, 20 km. SE of Pescara.
CHARTS:  Digital: IT300033, IT300033 and IT500212.
Paper: BA 200.
US 54105 and 54120.
Publications:  NP47, Mediterranean Pilot Vol 3.
PORT LIMITS: 
Defined by a line connecting the following approximate positions: 
  1. 42° 21.86′ N, 014° 23.89′ E
  2. 42° 21.79′ N, 014° 24.02′ E
  3. 42° 21.35′ N, 014° 25.25′ E
  4. 42° 21.33′ N, 014° 25.90′ E
  5. 42° 21.30′ N, 014° 25.96′ E
  6. 42° 21.14′ N, 014° 26.00′ E
  7. 42° 20.83′ N, 014° 25.25′ E
  8. 42° 20.70′ N, 014° 24.68′ E.
DOCUMENTS:  The following documents are required for clearance inwards:
   Cargo Declaration (FAL Form 2)
   CLC
   Crew Effects Declaration (FAL Form 4)
   Crew List (FAL Form 5)
   Dangerous Goods Declaration (FAL Form 7)
   General Declaration (FAL Form 1)
   P&I Certificate
   Passenger List…