Home > Port
 

Contents

Pre Arrival:  Overview | Location | Charts | Documents   ...
Arrival:  Approaches | Pilotage | Anchorages
Communications:  Pratique | VHF
Berthing Ops:  Tugs | Berths | Mooring
Pollution:  Waste | Slops
Facilities:  Medical | Water | Fuel | Chandlery | Services   ...
Security:  Security
Local Info:  Time | Weather

Summary

Max. Size:  Breakbulk:  Draft 8.53 m. Bulk:  Draft 8.53 m.
Fuel:  Available.
Airport:  Rio de Janeiro Int'l, 80 km.
Repairs/Drydocks:  Floating, 22,000 tonnes., 130 m. × 71 m., draft 18.5 m. .
Medical:  Facilities available.
Angra dos Reis
Flag of Brazil
View weather forecast

BRADR

Also see GEBIG Terminal
OVERVIEW:  Medium sized regional port. Handles breakbulk, coal, dry bulk, offshore, project, Ro-Ro and steel products.
Exports include steel pipe, coils, slabs and sheets. Imports include breakbulk, project and offshore cargoes. Total port area 63,516 sq.m. Annual capacity approx. 585,000 tonnes dry cargo and 7,000 cu.m. (44,000 bbls.) wet cargo.
LOCATION:  Approx. 80 n.m. SW of Rio de Janeiro at the northern end of the Baia da Ilha Grande, Rio de Janeiro state.
CHARTS:  Digital: BR323100, BR401631, BR401632 and BR501636.
Paper: BA 3970.
US 24150, 24153, 24154 and 24164.
Publications:  NP5, South America Pilot Vol 1.
DOCUMENTS:  See General - Pre-Arrival Information before first Brazil port.
ISPS COMPLIANCE:  Port is compliant.
MAX. SIZE:  Breakbulk:  Draft 8.53 m.
Bulk:  Draft 8.53 m.
Also see Restrictions.
DENSITY:  1024.
RESTRICTIONS:  No daylight restrictions on operations.
Vessels with draft exceeding 8.84 m. may be accepted with permission from pilot…