Home > Port
 

Contents

Pre Arrival:  Overview | Location | Charts | Documents   ...
Arrival:  Pilotage
Communications:  Pre-Arrival | VHF
Berthing Ops:  Berths | Mooring
Cargo:  Bulk | Tankers | Hoses
Pollution:  Ballast
Facilities:  Water | Fuel | Chandlery | Drydock
Shore:  Airport
Misc:  Authority
Report:  Report

Summary

Max. Size:  Bulk:  25,000 d.w.t., LOA 150 m., draft 11.61 m. Tankers:  330,000 d.w.t., LOA 382 m., draft 14.3 m.
Fuel:  Available, arrange via Agent.
Airport:  Abu Dhabi Int'l, 230 km.
Ruwais Terminal
Flag of U.A.E.
View weather forecast

AE

OVERVIEW:  Ruwais Refinery Marine Terminals East (RRE) and West (RRW), operated by ADNOC Refining under the jurisdiction of Petroleum Ports Authority (ADNOC). Adjacent to RRW is a single berth serving the carbon black delayed coker (CBDC) terminal.
LOCATION:  Approximately 95 n.m. west of Abu Dhabi.
CHARTS:  Digital: GB303179, GB403780, GB503778, GB503779 and GB503796.
Paper: BA 3179, 3778, 3779, 3780, 3796 and 3951.
US 62401, 62404, 62440, 62459 and 806947.
Publications:  NP63, Persian Gulf Pilot.
DOCUMENTS:  See `` Ruwais - Pre-Arrival Information''.
ISPS COMPLIANCE:  Port is compliant.
Also see `` Ruwais - ISPS Compliance''.
MAX. SIZE:  Bulk:  25,000 d.w.t., LOA 150 m., draft 11.61 m.
Tankers:  330,000 d.w.t., LOA 382 m., draft 14.3 m.
RESTRICTIONS:  At berth CBDC, vessels with LOA less than 160 m. the maximum wind speed for berthing is 18 knots port side alongside and 15 knots starboard side