Home > Port
 

Contents

Pre Arrival:  Overview | Location | Charts | Limits   ...
Arrival:  Pilotage | Anchorages
Communications:  Pratique | Pre-Arrival | VHF | VTS/Radar
Berthing Ops:  Tugs | Berths | Mooring
Cargo:  Breakbulk | Bulk | Containers | Tankers | Gas   ...
Pollution:  Waste | Slops
Facilities:  Medical | Water | Fuel | Chandlery | Storing   ...
Security:  Police etc | Security
Local Info:  Weather | Congestion
Misc:  Authority

Summary

Max. Size:  Breakbulk:  LOA 180 m., draft 9.5 m. Containers:  LOA 160 m., draft 9.0 m. Bulk:  LOA 180 m., draft 9.5 m. Tankers:  LOA 150 m., draft 9.0 m.
Fuel:  By road tanker.
Airport:  Porto Int'l, 70 km. Lisbon Int'l, 230 km.
Repairs/Drydocks:  Graving Dock 104 x 18.0 x 6.5 m. with capacity 3,500 g.t.
Medical:  Facilities available.

PTAVE

OVERVIEW:  A river port handling dry and liquid cargoes, including dry bulk, breakbulk, forest products, containers, project and bulk liquids. There are also shipyard facilities and berths for fishing vessels, local passenger ferries and leisure craft
The port of Aveiro is a Comprehensive port in the European Union's Trans-European Transport Network.
LOCATION:  On the Ria de Aveiro, 30 n.m. south of Porto and 120 n.m. north of Lisbon.
CHARTS:  Digital: PT324202, PT426403 and PT528506.
Paper: BA 3634.
US 51120.
Publications:  NP67, West Coasts of Spain and Portugal Pilot.
PORT LIMITS:  Seaward limits are defined by an arc of radius 6.0 n.m. centred on Aveiro Lighthouse, in position 40° 38.56′ N, 008° 44.86′ W.
DOCUMENTS:  See General - Pre-Arrival Information before first Portugal port.
ISPS COMPLIANCE:  Port is compliant.
MAX. SIZE:  Breakbulk:  LOA 180 m., draft 9.5 m.
Containers:  LOA 160 m., draft 9.0 m.
Bulk:  LOA 180 m., draft 9.5